
This Mighty Mac plant was installed to intercept 4,000 GPD of wastewater from a large condominium project in Cabo San Lucas and treat it for irrigation. By recycling a portion of their wastewater, they are able to reduce their total water bill by 25%. They are saving about 1.5 million gallons per year while reducing the load on the local waste treatment plant. Payback for this plant is about 2.5 years.




 English
English				 Spanish
Spanish